DEAL GUIDE

How we run a deal

This page describes step by step how a client deal runs: who sets each task, who does it and what comes out of it. Choose a scenario in “Task path” or open the task you need in the list below.

Sources: Vladimir's BP map (version 24.11), evaluation of the call on 24.11, our instructions. The chain has 65 tasks; short answers exist for 72, an instruction or part of one for 51.

Symbols and glossary

How to read this page

Code
The number of the task in the deal chain. The letter at the end: L — Local (supplier in Serbia), A — Abroad (supplier abroad), F — Full (full shipment), P — Partial (partial shipment).
Who sets → who does
Two coloured badges in the row: on the left the department that sets the task, on the right the department that does it.
Four tiles
In an opened task: who sets → who does → what comes out (result) → where it is kept.
if needed
The task is not set in every deal, only when it is needed.
was 3K
The task's former code. In Bitrix it may still have its old name.
live
The task is already used in real deals.
in test
So far the task exists only in the test template; it is not yet in real deals.
not clarified yet
Nobody knows this for sure yet. We say so instead of guessing.
not in the map
The task is not in the BP map: it appeared later, or it is a proposal.

Departments

Sales · KAM
KAM (Key Account Manager) is the sales manager who handles the client and their deal from the request to closing. The KAM sets the main task 01 and most tasks of the deal. Apart from the courier at delivery, only the KAM talks to the client.
Procurement
Find suppliers, request prices and delivery times, place the order with the supplier and follow it until the goods are received. Local means suppliers in Serbia, Abroad means suppliers abroad.
Finance
The client order in 1С, payments to suppliers, customs documents and cost price in 1С, and at the closing of a deal the check in SEF and of the incoming money.
Administration · MPP
Makes the documents in the MPP program: predračun, avansni račun, otpremnica, račun and kalkulacija for received goods. Sends the račun documents to SEF.
Warehouse
Receives the goods and records the receipt in 1С, agrees the delivery with the client, ships and delivers the goods, and enters the delivery costs in 1С.
Legal
Contracts and POs, checking the client's documents.
IT
Technical selection: helps to understand what to offer the client and checks whether the supplier's goods fit.
Management
Approves the planned and the final deal card.
created automatically
Nobody sets the task by hand: it is created automatically together with the task it belongs to.
not clarified yet
The BP map does not say who does this.

Glossary

Deal
One client order, from the first request to payment and closing.
Main task 01
The task a deal starts with. All other tasks are set from it, and their results are collected in it.
Umbrella task
A task that does not “do” anything itself but groups several subtasks under it (for example 4, 7, 9).
BP map
The diagram of the business process “Client deal” drawn up by Vladimir. This page is built on it.
Bitrix
Bitrix24 is the system in which deals and tasks are kept. A flow is a queue of tasks of one type. A project is a group in which tasks are kept. Service User is a technical user in whose name automatic tasks are created.
Order Management (OM)
ITMATHICS' own program: in it the KAM creates the deal and the quote, and the buyer creates the supplier order.
1С
Accounting system: client and supplier orders, goods receipt, shipment, cost price.
MPP
The program in which documents for the client and for Serbian accounting are made: predračun, otpremnica, račun, kalkulacija.
SEF
Serbia's state system for electronic invoices. Račun documents are sent and received through it.
Predračun
A bill for payment before delivery (pro forma). We issue it to the client; a local supplier issues it to us. A pre-invoice is the same from a foreign supplier.
Advance, avansni račun
An advance is a prepayment from the client. An avansni račun is the document issued for a received advance.
Otpremnica
Delivery note for a shipment. The client signs it on receiving the goods.
Račun
Invoice for shipped goods. A konačni račun is the final one, with the advance deducted. A delimični račun covers part of the order in a partial shipment.
Kalkulacija
A document in MPP that is made for received goods and posted to the KEP book.
Devizni
In foreign currency: foreign-currency predračun, foreign-currency payment.
Revers
A document for goods handed to the client free of charge.
Quote (KP)
A commercial offer to the client.
PO
Purchase order: an order that the client sends.
Deal card (DealCard)
The calculation of a deal. The KAM fills in the planned card before the sale, and management approves it. The final card compares plan and actual figures after closing; the KPI is calculated from it.
KPI
A measure of the deal's result. It is calculated from the gross profit in the final card.
Cost price
What the goods really cost us: purchase price plus delivery, customs and funds.
Funds
Levies that are charged in 1С on received goods and are part of the cost price.
DDP
Delivery term: delivery, duties and taxes are already included in the price.
Customs broker
Handles the customs clearance of the imported goods and issues an invoice for it.
Potvrda, SWIFT
Bank confirmations of a payment to a foreign supplier.
Advance register
The table in which the administration keeps track of received advances.
B2G
Sale to a government client.

Task path

One deal can have both local and foreign suppliers: under task 4, a separate order 4L or 4A is set for each supplier.

0 · Request2 · Order and deal card3 · Invoice to the client01Main task of the dealSales · KAM00Technical task for the ITdepartmentIT1.1Price and delivery timerequest · LocalProcurement1.2Price and delivery timerequest · AbroadProcurement2Client order in 1С via OMFinance2.2Planned deal cardSales · KAM2.2.1Approval of the planneddeal cardManagement2.3Quote to the clientSales · KAM11Contract / PO (Legal)Legal3Predračun (MPP)Administration · MPP3PPostpaid (pay afterdelivery)Administration · MPP3.1Advance payment from theclientAdministration · MPP3.2Advance not closedAdministration · MPP2.4Invoice request to thesupplierProcurement2.5Reservation of goods withthe supplierProcurement4 · Order placement4L / 4A · Supplier order5 · Payment6 · Goods receipt4Umbrella: carte blanchefor placing ordersProcurementLocal · supplier in Serbia4LSupplier order · LocalProcurement4.1LPredračun request to thesupplierProcurement4.2LSupplier order in 1СProcurement4PProblem — problem with thesupplierProcurement5LSupplier paymentFinance5.1LSupplier check: SEF orDriveFinance6LGoods receipt and 1СWarehouse6.1LGoods receipt, physicaland in 1СWarehouse6.2LKalkulacija in MPPAdministration · MPPAbroad · supplier abroad4ASupplier order · AbroadProcurement4.1APre-invoice request to thesupplierProcurement4.2ASupplier order in 1СProcurement4PProblem — problem with thesupplierProcurement5ASupplier paymentFinance5.1ASupplier check: SEF orDriveFinance5TTransportProcurement6AGoods receipt and 1СWarehouse6.1AGoods receipt, physicaland in 1СWarehouse6.2AKalkulacija in MPPAdministration · MPP6.3ACustoms: documents fromprocurementProcurement6.3.1ADocuments to Google DriveFinance6.4ACost price in 1СFinance5BBrokernot in the map7 · Shipment8 · Račun9 · Closing7Shipment (umbrella)Warehouse7FFull shipment · FULLWarehouse7PPartial shipment · PARTWarehousee-otp7.3 e-otpremnica (publicsector)Finance7.1FAgreeing the shipmentWarehouse7.1PAgreeing the shipmentWarehouse7.2FOtpremnica in 1С anddeliveryWarehouse7.2POtpremnica in 1С anddeliveryWarehouse7.3FOtpremnica in MPPAdministration · MPP7.3POtpremnica in MPPAdministration · MPP7.4FPosting costs in 1СWarehouse7.4PPosting costs in 1СWarehouse8FRačun for the shipmentAdministration · MPP8PDelimični računAdministration · MPP9Deal closing: SEF, money,costsSales · KAM9.1SEF and check of 7Finance9.2Money receivedFinance9.3Costs postedFinance9.4Final deal card (plan /actual)Sales · KAM9.4.1Approval of the final dealcardManagement

All tasks by stage

Who sets → who does:Sales · KAMProcurementFinanceAdministration · MPPWarehouseLegalITManagementcreated automaticallynot clarified yet

↻ created automatically — the task is created together with its parent task.

Request 5 tasks

01Main task of the dealSales · KAM→Sales · KAMlive
SetsSales · KAM

The KAM, for every client request — by hand or through OrderManagement: a robot creates the CRM deal, 01 and the client order in 1С by itself.

→
DoesSales · KAM

The KAM who owns the deal. The KAM runs it from the request to closing and — apart from the courier at delivery — is the only channel to the client.

→
Result

01 with the deal ID; in the comments, links to the DealCard, the predračun (pro forma invoice), the otpremnica documents (delivery notes) and the račun documents (invoices).

→
Where it is kept

flow: each KAM has their own flow 01: 64, 70, 84, 120, 78 (B2G), 122, 136 → project 280 and others «01 · проект КАМа (280 «01. Artem Aliev»; 290, 26, 402, 296 B»

The main task of the deal. The deal starts with it: the KAM creates it in Order Management, chooses the flow, the client, the delivery address and the goods, and together with it a CRM deal and a client order in 1С appear. From then on the whole deal is run from here: subtasks are set from 01, and their results are collected in it.

Why this taskSo that the deal has a main task: all subtasks are set from it and collected in it.instruction 01
What happens hereThe KAM creates the deal in Order Management: chooses the flow, the client, the delivery address and the goods; a CRM deal, task 01 and a client order in 1С are created together. From then on the deal is run from task 01.instruction 01
Who is responsible for whatSet and run by the KAM of the deal; apart from the courier at delivery, the KAM is the only channel to the client. Systems: Order Management, Bitrix (each KAM has their own flow 01).BP map
00Technical task for the IT departmentif neededSales · KAM→ITlive
SetsSales · KAM

The KAM, as a subtask of 01 in flow 54 — when without IT it is unclear what to offer the client. Procurement sets the same task when they need to check whether the supplier's goods or configuration fit the request.

→
DoesIT

IT department: Artem Meleshkin — does it himself or assigns it to Vladislav Kudryashov and Daniil Keller; Syrve and HoReCa — Vladimir Loktaev.

→
Result

An answer in the task: a specification or a recommendation — what fits and why; or completed work, for example an assembled and configured PC. The outcome is posted as a comment in 01.

→
Where it is kept

flow 54 → project 34 «00*. Системные администраторы» (System administrators)

A technical task for the IT department. It is not needed in every deal: the KAM sets it when it is unclear without IT what to offer the client, and procurement sets it when they need to check whether the supplier's goods or configuration fit the request. IT looks for a solution, checks it and returns the answer to the same task.

Why this taskNeeded when without IT it is unclear what to offer the client, or when procurement has to check whether the supplier's goods or configuration fit the request.BP map
What happens hereIT works from the task itself: looks for a solution, including with Claude, checks the answer and returns it to task 00.instruction 00
Who is responsible for whatSet by the KAM as a subtask of 01; procurement sets the same task to check goods. Done by the IT department: Artem Meleshkin himself, or he assigns it to Vladislav Kudryashov and Daniil Keller; Syrve and HoReCa are handled by Vladimir Loktaev. System: Bitrix (flow 54, project 34).BP map
1.1Price and delivery time request · LocalSales · KAM→Procurementlive
SetsSales · KAM

The KAM, together with 01 or after the selection in 00: 1.1 if the goods may be available in Serbia, 1.2 if they are not available in Serbia or abroad is cheaper; if unclear, both.

→
DoesProcurement

Iva Milosavljevic; backup Aleksandra Bakhtiarova; assigned by Nikita Krutikov. All buyers are observers of each other's tasks (No. 133A: done in test, not live).

→
Result

For every item of the request: “found” (supplier, price, delivery time; for imports including delivery, duty and broker) or “not found”. Closed after approval by Nikita Krutikov (No. 135A).

→
Where it is kept

flow 40 → project 12 «1.1. B2B. Local (Serbia) Inquiries»

Request for prices and delivery times from local suppliers. The buyer picks suppliers for the items of the request, asks them for offers, answers their questions along the way and enters the offers in the table. In the end, for every item there is a final price, a delivery time and a supplier, or a reason why there is no offer.

Why this taskTo get, for the items of the request, final prices, delivery times and the supplier who gave them, or the reason why there is no offer: for example end of life, and an alternative instead of the requested item.call 24.11, 00:54:06–00:54:13
What happens hereThe buyer chooses suppliers for the items, asks them for these items, receives offers, answers the suppliers' questions along the way and enters the offers in the table.call 24.11, 00:54:34–00:55:01
Who is responsible for whatSet by the KAM together with 01 or after the selection in 00. Done by Iva Milosavljevic, backed up by Aleksandra Bakhtiarova, assigned by Nikita Krutikov; the task is closed after his approval. System: Bitrix (flow 40, project 12).BP map
1.2Price and delivery time request · AbroadSales · KAM→Procurementlive
SetsSales · KAM

The KAM, together with 01 or after the selection in 00: 1.1 if the goods may be available in Serbia, 1.2 if they are not available in Serbia or abroad is cheaper; if unclear, both.

→
DoesProcurement

Yulia Zhuravleva; backup Nikita Krutikov; assigned by Nikita Krutikov. All buyers are observers of each other's tasks (No. 133A: done in test, not live).

→
Result

For every item of the request: “found” (supplier, price, delivery time; for imports including delivery, duty and broker) or “not found”. Closed after approval by Nikita Krutikov (No. 135A).

→
Where it is kept

flow 42 → project 38 «1.2. B2B. Abroad (EU+UAE+China) Inquiries»

Request for prices and delivery times from foreign suppliers. It is done the same way as 1.1, but the calculation is harder: you need the cost price of the item, that is the DDP price without VAT that already includes transport, duties, taxes and funds. For this a separate calculator and table or brokers are used, and for China the supplier is sometimes checked in addition.

Why this taskTo get the cost price of the item when buying abroad: the DDP price without VAT that already includes transport, duties, taxes and funds.call 24.11, 01:00:04–01:01:01
What happens hereThe same as in 1.1, but the calculation is done in another, more complex calculator with an additional table, or through brokers, to find out the customs percentage per item. For China the supplier is sometimes checked in addition.call 24.11, 00:59:01–01:01:41
Who is responsible for whatSet by the KAM together with 01 or after the selection in 00. Done by Yulia Zhuravleva, backed up and assigned by Nikita Krutikov; the task is closed after his approval. System: Bitrix (flow 42, project 38).BP map
1.2.1EU consolidationProcurement→Procurementnot clarified yet
SetsProcurement

Abroad buyer

→
DoesProcurement

Abroad procurement

→
Result

Supplier offer

→
Where it is kept

not clarified yet: no flow or project found in Bitrix

Consolidation in the EU: goods from different orders are collected at a warehouse in Germany and shipped to Serbia as one consignment to save on delivery. First it is decided whether this is needed and possible. At the moment the task is not carried out in practice: the process for it is not finished.

Why this taskTo collect goods from different orders at a warehouse in Germany and ship them to Serbia as one consignment to save costs.call 24.11, 01:02:41–01:03:07
What happens hereFirst they decide whether the goods will go into consolidation: whether it is needed and possible. The larger process for this task is not finished; in practice it is not carried out.call 24.11, 01:03:23–01:03:52
Who is responsible for whatSet by the Abroad buyer, done by Abroad procurement. There is no template, flow or project in Bitrix.BP map

Order, deal card, quote 9 tasks

2Client order in 1С via OMSales · KAM→Financelive
SetsSales · KAM

The KAM or OM — through OrderManagement or by hand, before the planned deal card 2.2.

→
DoesFinance

1С / finance: Dmitrij Moiseev, Irina Leitskaya.

→
Result

«Заказ клиента» (Client order) in 1С; order number = the agreed offer. The supplier order (4.2), the otpremnica documents (delivery notes, 7.2) and the račun documents (invoices, 8) are made from it.

→
Where it is kept

flow 48 → project 270 «2. B2B. Заказ клиента в 1C» (Client order in 1С)

Client order in 1С. The task is created together with 01 from Order Management, and a client order appears in 1С; the KAM adds Irina to the task. Code 2 groups all steps related to preparing the quote for the client.

Why this taskThis is an “umbrella task”: it groups all steps related to preparing the quote for the client.call 24.11, 01:30:54
What happens hereTask 2 is created together with 01 from Order Management; a client order appears in 1С. The KAM adds Irina to task 2.instruction 01
Who is responsible for whatSet by the KAM or by Order Management, before the planned deal card 2.2. Done by finance: Dmitrij Moiseev and Irina Leitskaya. Systems: 1С, Order Management, Bitrix (flow 48, project 270).BP map
2.1Check of the client order in 1Сcreated automatically→Financenot clarified yet
Setscreated automatically

in the scheme — “automatically”

→
DoesFinance

Moiseev / Leitskaya

→
Result

1С order number

→
Where it is kept

not clarified yet: no flow or project found in Bitrix

Check of the client order in 1С. The item master data (nomenclature) goes from this order into the supplier order, the goods receipt and all other documents, so it must be filled in correctly: items, quantity, final sales price, status «к выполнению» (to be fulfilled), items «к обеспечению» (to be supplied) and the «обособленно» (separately) checkbox. Until this is done, procurement (stage 4) does not start.

Why this taskSo that the client order in 1С is filled in correctly: the item master data (nomenclature) is pulled from it into the supplier order, the goods receipt and all other documents.call 24.11, 01:27:48–01:28:37
What happens hereThe order must contain: the correct items, quantity, final sales price, status «к выполнению» (to be fulfilled), items «к обеспечению» (to be supplied) and the «обособленно» (separately) checkbox; what the client does not take is set to «не обеспечивать» (do not supply). Until this is done, stage 4 does not start.call 24.11, 01:20:07–01:26:12
Who is responsible for whatIn the scheme the task is set “automatically”; done by Dmitrij Moiseev and Irina Leitskaya. There is no template, flow or project in Bitrix. System: 1С.BP map
2.2Planned deal cardwas 3KSales · KAM→Sales · KAMlive
SetsSales · KAM

The KAM, from a template, as a subtask of 01 — when there are prices from 1.1 / 1.2 and a client order in 1С (2).

→
DoesSales · KAM

The KAM — set yourself as assignee (by default Vladimir Malykhin is set). Observers — Kevin Müller and Daniil Petrzhikovskii. In live use all tasks of the flow go to Vladimir Malykhin, and he passes the card on to the KAM.

→
Result

Link to the DealCard — as the result of the task and in 01.

→
Where it is kept

flow 232 (called «3K…» in live use) → project 686 «3K. Плановая карточка сделки НОВЫЙ» (Planned deal card NEW)

Planned deal card (DealCard). The KAM fills in the Deal Card tab in the same table procurement works in and sends the link; almost everything is calculated automatically, only the yellow fields are entered by hand. The card goes to approval in 2.2.1, and only after that are the quote (2.3) and the predračun (pro forma invoice, 3) unlocked.

Why this taskSo that the deal has a planned deal card (DealCard): after its approval in 2.2.1 the quote (2.3) and the predračun (3) are unlocked.BP map
What happens hereThe KAM fills in the Deal Card tab in the same table procurement works in and sends the link. Everything is calculated automatically except the yellow fields: the KAM enters those.call 24.11, 01:31:47–01:32:35
Who is responsible for whatSet by the KAM from a template, as a subtask of 01, when there are prices from 1.1 or 1.2 and a client order in 1С. Assignee: the KAM; by default Vladimir Malykhin is set, and he passes the card on to the KAM. Observers: Kevin Müller and Daniil Petrzhikovskii. System: Bitrix (flow 232, called «3K» in live use; project 686).BP map
2.2.1Approval of the planned deal cardwas 3.1Kcreated automatically→Managementlive
Setscreated automatically

Automatically: Bitrix creates it from template 2.2 at the moment 2.2 is created (to the question «Создать подзадачи» (Create subtasks) — «Да» (Yes)). Task creator — Service User. No need to set it by hand.

→
DoesManagement

Kevin Müller; co-assignees Vladimir Malykhin and Daniil Petrzhikovskii. Add yourself as an observer — that way you will see the answer.

→
Result

«Согласовано» (Approved) in the 2.2.1 chat; task closed.

→
Where it is kept

outside a flow (sub-template) → project 686 «3K. Плановая карточка сделки НОВЫЙ» (Planned deal card NEW)

Approval of the planned deal card. The task is created automatically together with 2.2: the approvers write «Согласовано» (Approved) in the task chat, after which it is closed. This is the permission to go on to the quote (2.3) and the predračun (pro forma invoice, 3).

Why this taskTo approve the planned deal card: «Согласовано» unlocks the quote (2.3) and the predračun (3).BP map
What happens hereThe task is created automatically together with 2.2. The approvers write «Согласовано» in the 2.2.1 chat, and the task is closed.BP map
Who is responsible for whatCreated by Bitrix from template 2.2, task creator Service User. Approved by Kevin Müller; co-assignees Vladimir Malykhin and Daniil Petrzhikovskii. System: Bitrix (project 686).BP map
2.3Quote to the clientcreated automatically→Sales · KAMin test since 16.11
Setscreated automatically

Automatically — as a subtask of 2.2 (decided, No. 128B). In test, template 710; in live use there is no template yet — until the switch the quote remains a step of the KAM.

→
DoesSales · KAM

The KAM of the deal.

→
Result

The client's answer: consent by e-mail, a signed predračun (pro forma invoice) or a PO; the outcome as a comment in 01. Checklist and result are not defined in the template.

→
Where it is kept

outside a flow (sub-template) → project 686 «3K. Плановая карточка сделки НОВЫЙ» (Planned deal card NEW)

Commercial offer (quote) to the client. If the client needs a quote, the KAM makes it in Order Management. The task is done when there is an answer from the client: consent by e-mail, a signed predračun (pro forma invoice) or a PO.

Why this taskTo get the client's answer to the quote: consent by e-mail, a signed predračun or a PO.BP map
What happens hereThe KAM makes the quote in Order Management if the client needs one.instruction 01
Who is responsible for whatCreated automatically as a subtask of 2.2; done by the KAM of the deal. In live use there is no template yet (in test, template 710): until the switch the quote remains a step of the KAM. System: Bitrix (project 686).BP map
2.4Invoice request to the supplierif needed · was 4LR / 4ARSales · KAM→Procurementlive
SetsSales · KAM

The KAM, if needed, before the order is placed — from a template, under 01 (decided 17.11). The task is optional; possible without reservation 2.5.

→
DoesProcurement

Nikita Krutikov → a Local or Abroad buyer.

→
Result

The attached supplier invoices. One task per deal: all invoices go into it (No. 137).

→
Where it is kept

flow 238 Local, 240 Abroad («4LR», «4AR» in live use) → project 656 «4.1. B2B. Order the goods from supplier»

Request for an invoice from the supplier before the order is placed. The task is set if needed: in the existing e-mail thread the buyer asks the supplier for a predračun (pro forma invoice, Local) or an invoice and puts the document in the task; if there is no document, the buyer writes the reason. This way it is checked already at stage 2 that the supplier offers exactly the item needed and at the right price.

Why this taskTo check at stage 2 that the supplier offers exactly the item that is needed, and at the right price: if one letter in the name differs, it is already a different product.call 24.11, 01:42:34–01:43:18
What happens hereIn the existing e-mail thread the buyer asks the supplier for a predračun (Local) or an invoice. The document is added to the task; if there is none, the reason is written.call 24.11, 01:36:21–01:36:54
Who is responsible for whatSet by the KAM from a template under 01, if needed, before the order is placed; one task per deal, all invoices go into it. Nikita Krutikov assigns it to a Local or Abroad buyer. System: Bitrix (flows 238 Local and 240 Abroad, «4LR» and «4AR» in live use; project 656).BP map
2.5Reservation of goods with the supplierif needed · was 4RSales · KAM→Procurementlive
SetsSales · KAM

The KAM, if needed, before the order is placed — from a template, under 01 (decided 17.11). The task is optional; possible without invoice 2.4.

→
DoesProcurement

Nikita Krutikov → a Local or Abroad buyer.

→
Result

What is reserved, with which supplier, how much and until what date. One task per deal: all reservations go into it (No. 137).

→
Where it is kept

flow 236 («4R» in live use) → project 654 «4. B2B. Reservation for the articles in inquiry»

Reservation of goods with the supplier. The task is set if needed: the buyer asks the supplier to reserve the goods and writes the answer in a comment: reserved until a certain date, or not reserved and why. In the end it is recorded what is reserved, with which supplier, how much and until what date.

Why this taskSo that it is recorded what is reserved, with which supplier, how much and until what date.BP map
What happens hereThe buyer writes to the supplier in the existing thread asking for a reservation and enters the answer in a comment: the goods are reserved until a date, or not reserved, with the reason.call 24.11, 01:37:35–01:38:18
Who is responsible for whatSet by the KAM from a template under 01, if needed, before the order is placed; one task per deal, all reservations go into it. Nikita Krutikov assigns it to a Local or Abroad buyer. System: Bitrix (flow 236, «4R» in live use; project 654).BP map
11Contract / PO (Legal)if neededSales · KAM→Legallive
SetsSales · KAM

The KAM — when the client requires a contract or a PO, or their documents have to be checked. 11.1 «Договор купли-продажи с поставщиком» (Sales contract with the supplier) and 11.2 «Договор перевозки / экспедиции» (Transport / forwarding contract) are set by procurement.

→
DoesLegal

Legal — Iana Starykh.

→
Result

The signed contract or PO — as the result of the task.

→
Where it is kept

flow 94 (queue) → project 348 «11. LAW DEPARTMENT TASKS»

Contract or PO through Legal. The task is set if needed: when the client requires a contract or a PO, or their documents have to be checked. The task creator describes the task in four points, the lawyer asks questions and prepares the document, and the manager agrees it with the client. The document signed by both sides is put into the task and into the archive on the server.

Why this taskNeeded when the client requires a contract or a PO, or their documents have to be checked.BP map
What happens hereThe task creator describes the task in four points. The lawyer asks questions and prepares the document, the manager agrees it with the client; both sides sign the document, and it is put into the task and into the archive on the server.instruction 11
Who is responsible for whatSet by the KAM; the contract with the supplier (11.1) and the transport contract (11.2) are set by procurement. Done by Legal: Iana Starykh. System: Bitrix (flow 94, project 348).BP map
11.0Uploading documents to the archivecreated automatically→Legallive
Setscreated automatically

sub-template 360 (under 11)

→
DoesLegal

lawyers

→
Result

not clarified yet

→
Where it is kept

outside a flow (sub-template) → project 348 «11. LAW DEPARTMENT TASKS»

Uploading documents to the archive. The task is created automatically under task 11 and is done by Legal. What exactly it produces is not clarified yet.

Why this taskno data
What happens hereno data
Who is responsible for whatCreated automatically: sub-template 360 under task 11. Done by Legal. System: Bitrix (project 348).BP map

Invoice to the client 4 tasks

3Predračun (MPP)Sales · KAM→Administration · MPPlive
SetsSales · KAM

The KAM — after order 2 and only after «согласовано» (approved) in 2.2.1.

→
DoesAdministration · MPP

Administration: Mariya Zernyukova, Adelina Nasyrova.

→
Result

PDF of the predračun (pro forma invoice) in task 3; amounts = 1С order. The KAM sends it to the client.

→
Where it is kept

flow 46 → project 648 «3. Predracun (MPP)»

Predračun (pro forma invoice) to the client. When the order has been approved (after «Согласовано» (Approved) in 2.2.1), the administration creates the predračun in MPP: client, articles, quantity and price, header; the amounts must match the order in 1С. The PDF is put into the task chat with a mention of the KAM, and the KAM sends it to the client.

Why this taskTo issue the predračun for the approved order to the client; the amounts equal the order in 1С.BP map
What happens hereThe administration creates the predračun in MPP: client, articles, quantity and price, header. The PDF is put into the chat of task 3 with a mention of the KAM; the KAM sends the PDF to the client.instruction 3
Who is responsible for whatSet by the KAM after order 2 and only after «Согласовано» (Approved) in 2.2.1. Done by the administration: Mariya Zernyukova, Adelina Nasyrova. Systems: MPP, Bitrix (flow 46, project 648).BP map
3.1Advance payment from the clientSales · KAM→Administration · MPPlive
SetsSales · KAM

The KAM — when the client's money has arrived in the account, not on the strength of a letter from the client.

→
DoesAdministration · MPP

Administration — Mariya Zernyukova.

→
Result

Avansni račun (advance invoice) in SEF for the amount received — within one day.

→
Where it is kept

flow 90 → project 652 «3.1. B2B. Avans/Advance payment from client»

Advance payment from the client. The KAM sets the task when the client's money has really arrived in the account, not on the strength of a letter from the client. Using the PDF of the predračun (pro forma invoice) and a screenshot of the incoming payment from the bank statement, the administration creates the avansni račun in MPP, sends it to SEF within one day, enters it in the advance register and puts the PDF into the task chat.

Why this taskTo issue the avansni račun in SEF for the amount received from the client, within one day.BP map
What happens hereUsing the PDF of the predračun and a screenshot of the incoming payment from the bank statement, an avansni račun is created in MPP, sent to SEF and entered in the advance register; the PDF is put into the chat of task 3.1.instruction 3.1
Who is responsible for whatSet by the KAM when the client's money has arrived in the account, not on the strength of a letter from the client. Done by the administration: Mariya Zernyukova. Systems: SEF, Bitrix (flow 90, project 652).BP map
3.2Advance not closedcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically: Bitrix creates it from the advance template when 3.1 is created — if the question «Создать подзадачи» (Create subtasks) is answered «Да» (Yes). Otherwise there will be no 3.2. Task creator — Vladimir Malykhin (author of the template).

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova.

→
Result

Closed after shipment, when the Konačni račun (final invoice) with the advance deducted has been issued (8F or the last 8P).

→
Where it is kept

outside a flow (sub-template) → project 524 «3.2. АВАНСЫ (MPP)» (Advances)

Advance not closed. The task is created together with 3.1 and keeps the advance open until shipment. After shipment, a konačni račun with the advance deducted is created in MPP from the predračun (pro forma invoice), it is sent to SEF, the advance is marked in the register, and the task is closed.

Why this taskTo keep the advance open until shipment and close it with a konačni račun with the advance deducted.BP map
What happens hereAfter shipment a konačni račun is created in MPP from the predračun, the advance is offset, the document is sent to SEF, the advance is marked in the register, and the task is closed.instruction 3.2
Who is responsible for whatCreated automatically from the advance template together with 3.1 if the question «Создать подзадачи» (Create subtasks) is answered «Да» (Yes); task creator Vladimir Malykhin as the author of the template. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. Systems: MPP, Bitrix (project 524).BP map
3PPostpaid (pay after delivery)Sales · KAM→Administration · MPPnot clarified yet
SetsSales · KAM

KAM

→
DoesAdministration · MPP

Mariya Zernyukova; backup Adelina Nasyrova

→
Result

MPP predračun (pro forma invoice) number, amounts = 1С order

→
Where it is kept

not clarified yet: no flow or project found in Bitrix

Pay after delivery. This is a “placeholder” mark: it shows that payment after delivery has been agreed for the deal; it is confirmed when the deal card is approved (2.2.1). With payment after delivery, partial shipments are handled as separate deals, because in SEF they are different documents.

Why this taskTo mark that payment after delivery has been agreed for the deal.call 24.11, 01:39:53
What happens hereThis is a “placeholder” element: it marks that payment after delivery has been agreed. It is confirmed when the deal card is approved (2.2.1, formerly 3.1K). With payment after delivery, partial shipments go as separate deals, because in SEF they are different documents.call 24.11, 01:39:53–01:41:17
Who is responsible for whatSet by the KAM. Done by Mariya Zernyukova, backed up by Adelina Nasyrova. There is no template, flow or project in Bitrix.BP map

Procurement 8 tasks

4Umbrella: carte blanche for placing ordersSales · KAM→Procurementlive
SetsSales · KAM

The KAM, from a template, under 01 — the client has confirmed, the advance has arrived (if one is needed).

→
DoesProcurement

Nikita Krutikov assigns it to a buyer. Observers — procurement, finance, warehouse.

→
Result

Under 4 — a supplier order 4L or 4A for each supplier.

→
Where it is kept

flow 234 → project 654 «4. B2B. Reservation for the articles in inquiry»

Procurement umbrella task, “carte blanche for placing orders”. The KAM sets the task and writes: the deal card is approved, we buy from these suppliers. Then procurement takes over: under task 4 a separate order 4L or 4A is set for each supplier, and the KAM no longer goes into them.

Why this taskThe KAM sets umbrella task 4 and writes: the deal card is approved, we buy from these suppliers. Then procurement takes over; the KAM does not go into tasks 4L and 4A.call 24.11, 01:47:22–01:47:55
What happens hereUnder task 4 a supplier order 4L or 4A is set for each supplier.BP map
Who is responsible for whatSet by the KAM from a template under 01: the client has confirmed, the advance has arrived if one is needed. Nikita Krutikov assigns it to a buyer. Observers: procurement, finance, warehouse. System: Bitrix (flow 234, project 654).BP map
4ASupplier order · AbroadProcurement→Procurementlive
SetsProcurement

The buyer, from a template, under 4 — for every supplier order; sets themselves as assignee. The list of corrections of 12.11 says otherwise: “set by the KAM, assigned by Nikita” — the discrepancy is not resolved.

→
DoesProcurement

The buyer runs the order and closes 4L / 4A after the goods receipt (6). Observers — procurement, finance, warehouse and you.

→
Result

Closed after the goods receipt (goods received); the predračun (pro forma invoice) as the result

→
Where it is kept

flow 244 → project 664 «4.2. Order the goods from supplier»

Order to a foreign supplier. One task per order: the buyer finds it in the main task 01, checks the order description, sets themselves as assignee and runs the order from placing it to the goods receipt.

Why this taskTo run the order with one foreign supplier from placing it to the goods receipt.BP map
What happens hereThe buyer finds 4A in the main task 01, checks the order description, sets themselves as assignee and checks the subtasks of 4A.instruction 4A (procurement, from Nikita's video)
Who is responsible for whatSet by the buyer from a template under 4, for every supplier order, who sets themselves as assignee; closed after the goods receipt. Observers: procurement, finance, warehouse. System: Bitrix (flow 244, project 664).BP map
4.1APre-invoice request to the suppliercreated automatically→Procurementlive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No need to set it by hand.

→
DoesProcurement

The buyer of the order: by default Nikita Krutikov is set, and the buyer reassigns it to themselves. Observers — procurement and you. Decided 17.11: the assignee — the buyer from the parent 4L / 4A — will be set by the Claude agent once an hour (not done).

→
Result

The supplier's predračun (pro forma invoice) / pre-invoice — as the result of the task; payment in 5L / 5A is made on it. Note: the delivery time is here. If the delivery time changes, tell the client.

→
Where it is kept

outside a flow (sub-template) → project 656 «4.1. B2B. Order the goods from supplier»

Request for a pre-invoice from the foreign supplier. The task is created automatically together with 4A. The buyer posts the supplier's pre-invoice in the task chat, and the head of procurement confirms it; then the document must go to 5A for payment.

Why this taskTo get the pre-invoice of one specific supplier in order to pay it: the result must go to 5A.call 24.11, 01:46:09–01:48:18
What happens hereThe buyer posts the supplier's pre-invoice in the task chat, and the head of procurement confirms it.instruction 4.1A (procurement, from Nikita's video)
Who is responsible for whatCreated automatically together with 4A, task creator Service User. Assignee: the buyer of the order; by default Nikita Krutikov is set, and the buyer reassigns it to themselves. System: Bitrix (project 656).BP map
4.2ASupplier order in 1Сcreated automatically→Procurementlive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No need to set it by hand.

→
DoesProcurement

Decided: the buyer from the parent 4L / 4A; Irina Leitskaya and Dmitrij Moiseev are observers (No. 141); the assignee will be set by the Claude agent once an hour. Currently in live use — Irina Leitskaya. The contradiction is not resolved: the supplier order in OM is postponed until the buyers are moved to OM (No. 184B).

→
Result

The number of the supplier order in 1С — as the result, and only that. The warehouse receives the goods in 6.1 by it; the agent will copy the number into the description of 6 and 6.1.

→
Where it is kept

outside a flow (sub-template) → project 664 «4.2. Order the goods from supplier»

Supplier order in 1С. The task is created automatically together with 4A. In Order Management, on the «Закупки» (Procurement) tab, the buyer finds the client order, marks the lines of one supplier, enters the supplier, currency, quantity and purchase price and sends the order to 1С. The warehouse later receives the goods in 6.1 by the number of this order.

Why this taskSo that there is a supplier order in 1С: the warehouse receives the goods in 6.1 by its number.BP map
What happens hereIn Order Management, on the «Закупки» (Procurement) tab, the buyer finds the client order, marks the lines of one supplier, enters the supplier, currency, quantity and purchase price and sends the order to 1С.instruction 4.2A (OM, tab «Закупки» (Procurement))
Who is responsible for whatCreated automatically together with 4A, task creator Service User. Decided: assignee is the buyer from 4A, Irina Leitskaya and Dmitrij Moiseev are observers; currently in live use the assignee is Irina Leitskaya. Systems: Order Management, 1С, Bitrix (project 664).BP map
4LSupplier order · LocalProcurement→Procurementlive
SetsProcurement

The buyer, from a template, under 4 — for every supplier order; sets themselves as assignee. The list of corrections of 12.11 says otherwise: “set by the KAM, assigned by Nikita” — the discrepancy is not resolved.

→
DoesProcurement

The buyer runs the order and closes 4L / 4A after the goods receipt (6). Observers — procurement, finance, warehouse and you.

→
Result

Closed after the goods receipt (goods received); the predračun (pro forma invoice) as the result

→
Where it is kept

flow 242 → project 664 «4.2. Order the goods from supplier»

Order to a local supplier. One task per order: the buyer runs it from placing the order to the goods receipt; the KAM does not go in here. There are two results: the supplier order in 1С and the supplier's bill, which goes to payment.

Why this taskTo run the order with one local supplier from placing it to the goods receipt.BP map
What happens hereOnly procurement works in the task; the KAM does not go in. Two results: the supplier order in 1С and the supplier's bill, which goes to payment.call 24.11, 01:47:55–01:49:38
Who is responsible for whatSet by the buyer from a template under 4, for every supplier order, who sets themselves as assignee; closed after the goods receipt. Observers: procurement, finance, warehouse. System: Bitrix (flow 242, project 664).BP map
4.1LPredračun request to the suppliercreated automatically→Procurementlive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No need to set it by hand.

→
DoesProcurement

The buyer of the order: by default Nikita Krutikov is set, and the buyer reassigns it to themselves. Observers — procurement and you. Decided 17.11: the assignee — the buyer from the parent 4L / 4A — will be set by the Claude agent once an hour (not done).

→
Result

The supplier's predračun (pro forma invoice) / pre-invoice — as the result of the task; payment in 5L / 5A is made on it. Note: the delivery time is here. If the delivery time changes, tell the client.

→
Where it is kept

outside a flow (sub-template) → project 656 «4.1. B2B. Order the goods from supplier»

Request for a predračun (pro forma invoice) from the local supplier. The task is created automatically together with 4L. The supplier sends the predračun, the head of procurement confirms it, after which the predračun is moved to 5L and paid.

Why this taskTo get the bill from the supplier in order to pay it: the result goes to task 5.call 24.11, 01:46:09
What happens hereThe supplier sends the predračun, the head of procurement confirms it, the predračun is moved to 5L and paid. Described from the author's words; task 4L is not shown in the video.instruction 4L (procurement, from Nikita's video)
Who is responsible for whatCreated automatically together with 4L, task creator Service User. Assignee: the buyer of the order; by default Nikita Krutikov is set, and the buyer reassigns it to themselves. System: Bitrix (project 656).BP map
4.2LSupplier order in 1Сcreated automatically→Procurementlive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No need to set it by hand.

→
DoesProcurement

Decided: the buyer from the parent 4L / 4A; Irina Leitskaya and Dmitrij Moiseev are observers (No. 141); the assignee will be set by the Claude agent once an hour. Currently in live use — Irina Leitskaya. The contradiction is not resolved: the supplier order in OM is postponed until the buyers are moved to OM (No. 184B).

→
Result

The number of the supplier order in 1С — as the result, and only that. The warehouse receives the goods in 6.1 by it; the agent will copy the number into the description of 6 and 6.1.

→
Where it is kept

outside a flow (sub-template) → project 664 «4.2. Order the goods from supplier»

Supplier order in 1С. The task is created automatically together with 4L. In Order Management, on the «Закупки» (Procurement) tab, the buyer finds the client order, marks the lines of one supplier, enters the supplier, currency, quantity and purchase price and sends the order to 1С. The warehouse later receives the goods in 6.1 by the number of this order.

Why this taskSo that there is a supplier order in 1С: the warehouse receives the goods in 6.1 by its number.BP map
What happens hereIn Order Management, on the «Закупки» (Procurement) tab, the buyer finds the client order, marks the lines of one supplier, enters the supplier, currency, quantity and purchase price and sends the order to 1С.instruction 4.2L (OM, tab «Закупки» (Procurement))
Who is responsible for whatCreated automatically together with 4L, task creator Service User. Decided: assignee is the buyer from 4L, Irina Leitskaya and Dmitrij Moiseev are observers; currently in live use the assignee is Irina Leitskaya. Systems: Order Management, 1С, Bitrix (project 664).BP map
4PProblem — problem with the supplierif neededProcurement→Procurementin test since 16.11
SetsProcurement

buyer or KAM

→
DoesProcurement

Nikita Krutikov

→
Result

not defined (no checklist)

→
Where it is kept

no flow in live use; test 312 → no project (test 734) «4P. Problem — проект нужно создать» (project still to be created)

Problem with the supplier. A task for any unusual situation in the supply: the price went up, the goods ran out, something broke. It has been decided to try creating it automatically for every supplier order whose deadline has passed while the order is not closed, so that the KAM sees the problem already at stage 4. It can also be set by hand.

Why this taskTo deal with any unusual situation in the supply chain: the price went up, the goods ran out, something broke.call 24.11, 01:51:07
What happens hereDecided to try: 4P is created automatically for every supplier order whose deadline has passed while the order is not closed, so that the KAM sees the problem at stage 4. It can be set by hand by the KAM, Nikita Krutikov, Daniil Petrzhikovskii or any manager.call 24.11, 01:51:07–01:53:21
Who is responsible for whatSet by the buyer or the KAM, done by Nikita Krutikov. In live use there is no flow or project; in test, flow 312 and project 734.BP map

Supplier payment 8 tasks

5ASupplier paymentcreated automatically→Financelive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No separate payment task in flow 5 is needed. In live use it comes without a flow; the Claude agent will put it into flow 5 once an hour.

→
DoesFinance

Polina Veliaeva; payment confirmation — Nikita Krutikov. Observers — procurement and you (for 5A also Dmitrij Moiseev and Irina Leitskaya).

→
Result

Payment slip / SWIFT — as the result of the task; payment in 1С and MPP.

→
Where it is kept

flow: outside a flow (partly in flow 8) → project 44 «5. Оплата счетов» (Paying invoices)

Payment to a foreign supplier on the pre-invoice. The task is created automatically together with 4A. Polina takes the data from the pre-invoice that the buyer attached to the task, makes a foreign-currency (devizni) payment, attaches the invoice and posts first the potvrda and then the SWIFT in the chat.

Why this taskTo pay the foreign supplier on the pre-invoice; result: an executed payment, the potvrda and the SWIFT in the chat of task 5A.instruction 5A
What happens herePolina takes the data from the pre-invoice that the buyer attached to the task, repeats the previous foreign-currency payment in the same currency with the new data, attaches the invoice, authorises the payment and posts first the potvrda and then the SWIFT in the chat.instruction 5A
Who is responsible for whatCreated automatically together with 4A, task creator Service User. Paid by Polina Veliaeva, payment confirmed by Nikita Krutikov. Observers: procurement, Dmitrij Moiseev, Irina Leitskaya. Systems: bank, 1С, MPP, Bitrix (project 44).BP map
5.1ASupplier check: SEF or Drivecreated automatically→Financelive
Setscreated automatically

Automatically — together with 5L / 5A. Task creator — Polina Veliaeva (this is how the template is set up).

→
DoesFinance

Polina Veliaeva. No observers: this is the only subtask to which the KAM is not added.

→
Result

Outcome as a comment: «В SEF» (In SEF) or «Не SEF — выгружено в <месяц>» (Not SEF — uploaded in <month>).

→
Where it is kept

outside a flow (sub-template) → project 526 «5.1. Проверка поставщика (не в SEF, документы на Google Диск» (Supplier check (not in SEF, documents to Google Drive)

Check: is the supplier in SEF or not. The task is created automatically together with 5A and is a reminder to act: if the supplier is not in SEF, their documents must be uploaded to Google Drive; if they are in SEF, nothing needs to be done. The outcome is written as a comment: «В SEF» (In SEF) or «Не SEF, выгружено» (Not SEF, uploaded) with the month.

Why this taskThis is a prompt to act: if the supplier is not in SEF (all Abroad suppliers and some Local ones), upload the documents to Google Drive; if they are in SEF, nothing needs to be done.call 24.11, 01:56:26–01:57:33
What happens hereThe outcome is written as a comment: «В SEF» or «Не SEF, выгружено» with the month.BP map
Who is responsible for whatCreated automatically together with 5A, task creator Polina Veliaeva. Done by Polina Veliaeva; no observers. Systems: SEF, Google Drive, Bitrix (project 526).BP map
5BBrokernot in the map

Broker. This is a new task decided in the call of 24.11; it is not yet in the BP map. Everything about the broker and customs is collected in it, so that after the first paid bill the others are not forgotten. Proposal: keep a list in the task of what the broker usually sends, and use it to see what has arrived and what is still missing. Who runs the task and who pays is not decided yet.

Why this taskTo collect everything about the broker and customs in a separate task, so that after the first paid bill the others are not forgotten.call 24.11, 02:01:44–02:03:04
What happens hereProposal: the task has a list of what the broker usually sends; it shows what has arrived and what is still missing, for example the AWB release payment. Daniil has already made a checklist for DHL, FedEx and TIR Commerce; it needs to be converted.call 24.11, 02:00:16–02:02:14
Who is responsible for whatno data
5LSupplier paymentcreated automatically→Financelive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No separate payment task in flow 5 is needed. In live use it comes without a flow; the Claude agent will put it into flow 5 once an hour.

→
DoesFinance

Polina Veliaeva; payment confirmation — Nikita Krutikov. Observers — procurement and you (for 5A also Dmitrij Moiseev and Irina Leitskaya).

→
Result

Payment slip / SWIFT — as the result of the task; payment in 1С and MPP.

→
Where it is kept

flow: outside a flow (partly in flow 8) → project 44 «5. Оплата счетов» (Paying invoices)

Payment to a local supplier on their predračun (pro forma invoice). The task is created automatically together with 4L. Polina opens the predračun in the task, checks that the payment has been approved, makes the payment in the bank, attaches the payment slip to the task and writes «@Все paid» (@All paid).

Why this taskTo pay the local supplier on their predračun; result: a confirmed payment and the payment slip in task 5L.instruction 5L
What happens herePolina opens the predračun in the task, checks the payment approval, repeats the previous payment to this supplier in the bank with the new data, confirms it, attaches the payment slip to the task and writes «@Все paid».instruction 5L
Who is responsible for whatCreated automatically together with 4L, task creator Service User. Paid by Polina Veliaeva, payment confirmed by Nikita Krutikov. Systems: bank, 1С, MPP, Bitrix (project 44).BP map
5.1LSupplier check: SEF or Drivecreated automatically→Financelive
Setscreated automatically

Automatically — together with 5L / 5A. Task creator — Polina Veliaeva (this is how the template is set up).

→
DoesFinance

Polina Veliaeva. No observers: this is the only subtask to which the KAM is not added.

→
Result

Outcome as a comment: «В SEF» (In SEF) or «Не SEF — выгружено в <месяц>» (Not SEF — uploaded in <month>).

→
Where it is kept

outside a flow (sub-template) → project 526 «5.1. Проверка поставщика (не в SEF, документы на Google Диск» (Supplier check (not in SEF, documents to Google Drive)

Check: is the supplier in SEF or not. The task is created automatically together with 5L and is a reminder to act: if the supplier is not in SEF, their documents must be uploaded to Google Drive; if they are in SEF, nothing needs to be done. The outcome is written as a comment: «В SEF» (In SEF) or «Не SEF, выгружено» (Not SEF, uploaded) with the month.

Why this taskThis is a prompt to act: if the supplier is not in SEF (all Abroad suppliers and some Local ones), upload the documents to Google Drive; if they are in SEF, nothing needs to be done.call 24.11, 01:56:26–01:57:33
What happens hereThe outcome is written as a comment: «В SEF» or «Не SEF, выгружено» with the month.BP map
Who is responsible for whatCreated automatically together with 5L, task creator Polina Veliaeva. Done by Polina Veliaeva; no observers. Systems: SEF, Google Drive, Bitrix (project 526).BP map
5TTransportcreated automatically→Procurementlive
Setscreated automatically

Automatically — together with 4A. Task creator — Service User. No need to set it by hand.

→
DoesProcurement

Run by the Abroad buyer; Polina Veliaeva — co-assignee, and she pays (No. 126A). In live use the assignee is still Polina. Observers — procurement, Dmitrij Moiseev, Irina Leitskaya.

→
Result

Payment slips for all customs costs — in the task.

→
Where it is kept

outside a flow (sub-template) → project 44 «5. Оплата счетов» (Paying invoices)

Transport. The bills for delivery in the deal go here, including when transport is paid abroad, for example in China. The task is not always needed: sometimes the supplier pays for transport.

Why this taskTo pay for transport in the deal. The task is optional: sometimes the supplier pays for transport.call 24.11, 02:02:33–02:03:04
What happens hereThe bills for transport go here, including transport paid abroad, for example in China.call 24.11, 02:01:18
Who is responsible for whatCreated automatically together with 4A, task creator Service User. Run by the Abroad buyer; Polina Veliaeva is co-assignee and pays; in live use she is still the assignee. Systems: bank, Bitrix (project 44).BP map
5.1TCheck of documents for customs paymentsFinance→Financenot clarified yet
SetsFinance

in the scheme — Polina

→
DoesFinance

Polina Veliaeva

→
Result

«В SEF» (In SEF) / «не SEF — выгружено» (not SEF — uploaded) / «импорт» (import)

→
Where it is kept

not clarified yet: no flow or project found in Bitrix

Check of the documents for the payments from 5T. You need to check whether the document is in SEF; if not, upload it to the drive. The outcome is written like this: «В SEF» (In SEF), «не SEF, выгружено» (not SEF, uploaded) or «импорт» (import).

Why this taskTo check whether the document is in SEF; if not, upload it to the drive.call 24.11, 02:01:03
What happens hereThe outcome is written like this: «В SEF», «не SEF, выгружено» or «импорт».BP map
Who is responsible for whatIn the scheme it is set and done by Polina Veliaeva. There is no template, flow or project in Bitrix.BP map
incomingWaiting for delivery / incomingcreated automatically→not clarified yetnot clarified yet
Setscreated automatically

robot of project 44 at the stage Finished

→
Doesnot clarified yet

not clarified yet

→
Result

not clarified yet

→
Where it is kept

not clarified yet: no flow or project found in Bitrix

Waiting for delivery. The task is set by the robot of project 44 at the stage Finished. What exactly is done in it and who does it is not clarified yet.

Why this taskno data
What happens hereno data
Who is responsible for whatSet by the robot of project 44 at the stage Finished; who does it is not clarified yet. No template, flow or project was found in Bitrix.BP map

Goods receipt 9 tasks

6AGoods receipt and 1Сcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; for 6L Sergei Baranov is co-assignee, for 6A he is an observer. Observers — procurement, Dmitrij Moiseev, Irina Leitskaya, Mariya Zernyukova, Adelina Nasyrova and you.

→
Result

Goods in stock and a message about it to the KAM — in the task. Note: «Товар на складе» (Goods in stock) is the signal to agree the shipment with the client.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Goods receipt from a foreign supplier, umbrella task. The task is created automatically together with the supplier order 4A, and 6.1A, 6.2A, 6.3A and 6.4A are created with it. When the goods have been received, the warehouse tells the KAM: «Товар на складе» (Goods in stock) is the signal to agree the shipment with the client.

Why this taskTo receive the goods into the warehouse and tell the KAM: «Товар на складе» (Goods in stock) is the signal to agree the shipment with the client.BP map
What happens hereThe task is created automatically together with the supplier order 4A; 6.1A, 6.2A, 6.3A and 6.4A are created with it.BP map
Who is responsible for whatTask creator Service User. Done by Aleksey Belyaev; Sergei Baranov is an observer. Further observers: procurement, Dmitrij Moiseev, Irina Leitskaya, Mariya Zernyukova, Adelina Nasyrova. System: Bitrix (project 642).BP map
6.1AGoods receipt, physical and in 1Сcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with 6L / 6A. Task creator — Aleksey Belyaev (this is how the template is set up).

→
DoesWarehouse

Aleksey Belyaev; for 6.1A Sergei Baranov is co-assignee. Observers — procurement and you, for 6.1A also Dmitrij Moiseev and Irina Leitskaya.

→
Result

Receipt in 1С; the scan of the delivery note and the receipt number — as the result.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Receipt of imported goods: physically and in 1С. The warehouse opens the task and the invoice, creates «Приобретение товаров и услуг» (Purchase of goods and services) in 1С and adds the delivery; the result is the scan of the delivery note and the receipt number. The supplier order is not created in the goods receipt.

Why this taskTo receive the goods physically and record the receipt in 1С; the result is the scan of the delivery note and the receipt number.BP map
What happens hereAccording to Daniil, of the previous steps these should remain: open the task and the invoice, create «Приобретение товаров и услуг» (Purchase of goods and services) in 1С and add the delivery. The supplier order is created elsewhere, not in the goods receipt.call 24.11, 02:05:06–02:05:34
Who is responsible for whatCreated automatically together with 6A, task creator Aleksey Belyaev. Done by Aleksey Belyaev, co-assignee Sergei Baranov. Observers: procurement, Dmitrij Moiseev, Irina Leitskaya. Systems: 1С, Bitrix (project 642).BP map
6.2AKalkulacija in MPPcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically — together with 6L / 6A. Task creator — Aleksey Belyaev (this is how the template is set up).

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova. Observers — Dmitrij Moiseev, Irina Leitskaya, Polina Veliaeva, Aleksey Belyaev and you.

→
Result

MPP kalkulacija (costing document) number — as the result.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Kalkulacija (costing document) in MPP for the received imported goods. First check whether there is already a kalkulacija; then make a foreign-currency (devizna) kalkulacija, set it to «Важећа» (valid) and post it to the KEP book. The number of the kalkulacija is given as the result of the task.

Why this taskSo that MPP has a valid kalkulacija for the received goods, posted to the KEP book; its number is given as the result of the task.instruction 6.2A
What happens hereFirst check whether there is already a kalkulacija. Then make a foreign-currency kalkulacija, set it to «Важећа» (valid) and give the number of the kalkulacija as the result of the task.instruction 6.2A
Who is responsible for whatCreated automatically together with 6A, task creator Aleksey Belyaev. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. Systems: MPP, Bitrix (project 642).BP map
6.3ACustoms: documents from procurementcreated automatically→Procurementlive
Setscreated automatically

Automatically: 6.3A — together with 6A, 6.3.1A — together with 6.3A. Task creator of 6.3A — Aleksey Belyaev, of 6.3.1A — Dmitrij Moiseev (this is how the templates are set up).

→
DoesProcurement

Dmitrij Moiseev; co-assignee Irina Leitskaya. Observers — Polina Veliaeva, Mariya Zernyukova, Adelina Nasyrova and you, for 6.3A also Abroad procurement and Aleksey Belyaev.

→
Result

Customs documents in the task; link to the Drive folder — as the result of 6.3.1A.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Customs: documents from procurement. Procurement puts all customs information and files into the task; that is the result. This data is needed to calculate the cost price and to hand the documents over to accounting.

Why this taskSo that procurement hands over all customs information: it is needed to calculate the cost price and to give the documents to accounting.call 24.11, 02:08:15–02:08:54
What happens hereProcurement puts all customs information and files into the task; that is the result of the task.call 24.11, 02:08:42–02:09:33
Who is responsible for whatAssignee: Procurement; the group of assignees is given incorrectly in the materials.call 24.11, 02:08:06–02:09:55
6.3.1ADocuments to Google Drivecreated automatically→Financelive
Setscreated automatically

Automatically: 6.3A — together with 6A, 6.3.1A — together with 6.3A. Task creator of 6.3A — Aleksey Belyaev, of 6.3.1A — Dmitrij Moiseev (this is how the templates are set up).

→
DoesFinance

Dmitrij Moiseev; co-assignee Irina Leitskaya. Observers — Polina Veliaeva, Mariya Zernyukova, Adelina Nasyrova and you, for 6.3A also Abroad procurement and Aleksey Belyaev.

→
Result

Customs documents in the task; link to the Drive folder — as the result of 6.3.1A.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Customs documents to Google Drive. Dmitrij and Irina take the information from 6.3A and upload the customs documents to Google Drive to hand them over to the external accountants.

Why this taskTo hand the customs documents over to the external accountants.call 24.11, 02:09:39
What happens hereDmitrij and Irina take the information from 6.3A and upload the customs documents to Google Drive.call 24.11, 02:08:15–02:08:54
Who is responsible for whatCreated automatically together with 6.3A, task creator Dmitrij Moiseev. Done by Dmitrij Moiseev, co-assignee Irina Leitskaya. Systems: Google Drive, Bitrix (project 642).BP map
6.4ACost price in 1Сcreated automatically→Financelive
Setscreated automatically

Automatically — together with 6A. Task creator — Aleksey Belyaev (this is how the template is set up).

→
DoesFinance

Dmitrij Moiseev; co-assignee Irina Leitskaya. Observers — Aleksey Belyaev, Polina Veliaeva and you.

→
Result

1С document — as the result; cost price including customs and delivery. Note: the actual cost price is needed for the final deal card 9.4.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Cost price in 1С. Based on the purchase, the import customs declaration is posted, the broker's services are recorded as a separate purchase of services, and then the funds button creates one «Регистрация расходов» (Expense registration) document for each fund. This way the actual cost price including customs and delivery appears in 1С; it is needed for the final deal card 9.4.

Why this taskTo calculate in 1С the actual cost price including customs and delivery: it is needed for the final deal card 9.4.BP map
What happens hereBased on the purchase in 1С, the import customs declaration is posted according to the JCI and the Obračun, and the broker's services are recorded as a separate purchase of services; then the funds button creates one «Регистрация расходов» (Expense registration) document for each fund.instruction 6.4A (import customs declaration and funds)
Who is responsible for whatCreated automatically together with 6A, task creator Aleksey Belyaev. Done by Dmitrij Moiseev, co-assignee Irina Leitskaya. Systems: 1С, Bitrix (project 642).BP map
6LGoods receipt and 1Сcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with 4L / 4A. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; for 6L Sergei Baranov is co-assignee, for 6A he is an observer. Observers — procurement, Dmitrij Moiseev, Irina Leitskaya, Mariya Zernyukova, Adelina Nasyrova and you.

→
Result

Goods in stock and a message about it to the KAM — in the task. Note: «Товар на складе» (Goods in stock) is the signal to agree the shipment with the client.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Goods receipt from a local supplier, umbrella task. The task is created automatically together with the supplier order 4L, and 6.1L and 6.2L are created with it. When the goods have been received, the warehouse tells the KAM: «Товар на складе» (Goods in stock) is the signal to agree the shipment with the client.

Why this taskTo receive the goods into the warehouse and tell the KAM: «Товар на складе» (Goods in stock) is the signal to agree the shipment with the client.BP map
What happens hereThe task is created automatically together with the supplier order 4L; 6.1L and 6.2L are created with it.BP map
Who is responsible for whatTask creator Service User. Done by Aleksey Belyaev, co-assignee Sergei Baranov. Observers: procurement, Dmitrij Moiseev, Irina Leitskaya, Mariya Zernyukova, Adelina Nasyrova. System: Bitrix (project 642).BP map
6.1LGoods receipt, physical and in 1Сcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with 6L / 6A. Task creator — Aleksey Belyaev (this is how the template is set up).

→
DoesWarehouse

Aleksey Belyaev; for 6.1A Sergei Baranov is co-assignee. Observers — procurement and you, for 6.1A also Dmitrij Moiseev and Irina Leitskaya.

→
Result

Receipt in 1С; the scan of the delivery note and the receipt number — as the result.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Goods receipt: physically and in 1С. The warehouse receives the goods and records the receipt in 1С; the result is the scan of the delivery note and the receipt number. Our instruction so far describes only part of it: charging the FGZ fund after the purchase has been posted. The receipt itself is not described in it.

Why this taskTo receive the goods physically and record the receipt in 1С; the result is the scan of the delivery note and the receipt number.BP map
What happens hereOnly part is described: after the purchase has been posted in 1С, the FGZ fund is charged with the button «Регистрация расходов (Фонды)» (Expense registration (Funds)). The receipt itself is not described in the instruction.instruction 6.1L
Who is responsible for whatCreated automatically together with 6L, task creator Aleksey Belyaev. Done by Aleksey Belyaev. Systems: 1С, Bitrix (project 642).BP map
6.2LKalkulacija in MPPcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically — together with 6L / 6A. Task creator — Aleksey Belyaev (this is how the template is set up).

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova. Observers — Dmitrij Moiseev, Irina Leitskaya, Polina Veliaeva, Aleksey Belyaev and you.

→
Result

MPP kalkulacija (costing document) number — as the result.

→
Where it is kept

outside a flow (sub-template) → project 642 «6. Warehouse приходы» (Warehouse receipts)

Kalkulacija (costing document) in MPP for the received goods. First check whether there is already a kalkulacija; then make it from the electronic invoice or by hand, set it to «Важећа» (valid) and post it to the KEP book. The number of the kalkulacija is given as the result of the task.

Why this taskSo that MPP has a valid kalkulacija for the received goods, posted to the KEP book; its number is given as the result of the task.instruction 6.2L
What happens hereFirst check whether there is already a kalkulacija. Then make it from the electronic invoice or by hand, set it to «Важећа» (valid) and give the number of the kalkulacija as the result of the task.instruction 6.2L
Who is responsible for whatCreated automatically together with 6L, task creator Aleksey Belyaev. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. Systems: MPP, Bitrix (project 642).BP map

Shipment 12 tasks

7Shipment (umbrella)Sales · KAM→Warehouselive
SetsSales · KAM

The KAM, from a template, under 01 — the goods are in stock, the date and address have been agreed with the client.

→
DoesWarehouse

Warehouse — Aleksey Belyaev, Sergei Baranov. Observers — finance.

→
Result

Under 7 — a scenario for every shipment: 7F or 7P.

→
Where it is kept

flow 246 → project 14 «7. ОТГРУЗКА» (Shipment)

Shipment, umbrella task. The KAM sets the task when the goods are in stock and the date and address have been agreed with the client. Under it a scenario is set for every shipment: 7F for a full one or 7P for a partial one.

Why this taskTo start the shipment when the goods are in stock and the date and address have been agreed with the client.BP map
What happens hereUnder task 7 a scenario is set for every shipment: 7F for a full one or 7P for a partial one.BP map
Who is responsible for whatSet by the KAM from a template under 01. Done by the warehouse: Aleksey Belyaev, Sergei Baranov. Observers: finance. System: Bitrix (flow 246, project 14).BP map
7FFull shipment · FULLSales · KAM→Warehouselive
SetsSales · KAM

The KAM, from a template, under 7 — for every shipment.

→
DoesWarehouse

Aleksey Belyaev; co-assignee Sergei Baranov. Observers — finance and you.

→
Result

7.1F–7.4F and 8F closed

→
Where it is kept

flow 248 → project 14 «7. ОТГРУЗКА» (Shipment)

Full shipment. The KAM sets the scenario under task 7, and 7.1F, 7.2F, 7.3F, 7.4F and 8F are created automatically with it. The scenario is done when all of them are closed.

Why this taskScenario of a full shipment: done when 7.1F–7.4F and 8F are closed.BP map
What happens hereTogether with the scenario, 7.1F, 7.2F, 7.3F, 7.4F and 8F are created automatically.BP map
Who is responsible for whatSet by the KAM from a template under 7, for every shipment. Done by Aleksey Belyaev, co-assignee Sergei Baranov. Observers: finance. System: Bitrix (flow 248, project 14).BP map
7.1FAgreeing the shipmentcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with scenario 7F / 7P. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; co-assignee Sergei Baranov. Observer — you.

→
Result

Agreed date, time and address — in the task.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Agreeing the shipment with the client. The warehouse calls the client on the number from the shipment task, agrees the date and time of delivery, writes the agreement into the task chat and passes it on to the driver.

Why this taskTo agree the shipment date with the client.call 24.11, 02:14:53
What happens hereThe warehouse calls the client on the number from the shipment task, agrees the date and time of delivery, writes the agreement into the task chat and passes it on to the driver.instruction 7.1F
Who is responsible for whatCreated automatically together with scenario 7F, task creator Service User. Done by Aleksey Belyaev, co-assignee Sergei Baranov. System: Bitrix (project 14).BP map
7.2FOtpremnica in 1С and deliverycreated automatically→Warehouselive
Setscreated automatically

Automatically — together with the scenario. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; delivery — Sergei Baranov, a courier or pickup by the client. Observers — finance and you.

→
Result

Scan of the signed otpremnica (delivery note) — as the result.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Otpremnica (delivery note) in 1С and delivery. The warehouse finds the client order in 1С, switches it to shipment, creates the sales document (realizacija) and prints the otpremnica in two copies, then hands the goods over for delivery. After delivery, a scan of the otpremnica signed by the client is attached to the task: that is the result.

Why this taskTo issue the otpremnica in 1С and deliver the goods; result of the task: a scan of the otpremnica signed by the client.instruction 7.2F
What happens hereThe warehouse finds the client order in 1С, switches it to shipment, creates the sales document (realizacija), prints the otpremnica in two copies, hands the goods over for delivery and after delivery attaches a scan of the signed otpremnica.instruction 7.2F
Who is responsible for whatCreated automatically together with the scenario, task creator Service User. Done by Aleksey Belyaev; delivery: Sergei Baranov, a courier or pickup by the client. Systems: 1С, Bitrix (project 14).BP map
7.3FOtpremnica in MPPcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically — together with the scenario. Task creator — Service User. No need to set it by hand.

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova. Observers — Dmitrij Moiseev, Irina Leitskaya and you.

→
Result

MPP otpremnica (delivery note) number — as the result.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Otpremnica (delivery note) in MPP. Based on the signed otpremnica from 1С and the predračun (pro forma invoice), the administration creates the otpremnica in MPP: client, date, articles and quantity, price and VAT rate, delivery address. It must match the signed one; its number and PDF are given as the result of the task.

Why this taskSo that MPP has an otpremnica that matches the signed one in date, quantity and address; its number and PDF are given as the result of the task.instruction 7.3F
What happens hereBased on the signed otpremnica from 1С and the predračun, the administration creates the otpremnica in MPP: client, date, articles and quantity, price and VAT rate, delivery address. Then it saves the PDF and gives the result in the task.instruction 7.3F
Who is responsible for whatCreated automatically together with the scenario, task creator Service User. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. Systems: MPP, Bitrix (project 14).BP map
7.4FPosting costs in 1Сcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with the scenario. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; co-assignee Sergei Baranov. Observers — Dmitrij Moiseev, Irina Leitskaya, Polina Veliaeva and you.

→
Result

Delivery costs in 1С.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Delivery costs in 1С. The warehouse takes the delivery cost from the trip log, finds the client order in 1С, creates a cost document, posts it and writes about it in the task. This way the delivery costs are recorded in 1С against the client order.

Why this taskTo record the delivery costs in 1С against the client order.BP map
What happens hereThe warehouse takes the delivery cost from the trip log, finds the client order in 1С, creates a cost document by copying, posts it and writes about it in task 7.4.instruction 7.4F
Who is responsible for whatCreated automatically together with the scenario, task creator Service User. Done by Aleksey Belyaev, co-assignee Sergei Baranov. Systems: 1С, Bitrix (project 14).BP map
7PPartial shipment · PARTSales · KAM→Warehouselive
SetsSales · KAM

The KAM, from a template, under 7 — for every shipment.

→
DoesWarehouse

Aleksey Belyaev; co-assignee Sergei Baranov. Observers — finance and you.

→
Result

7.1P–7.4P and 8P closed

→
Where it is kept

flow 250 → project 14 «7. ОТГРУЗКА» (Shipment)

Partial shipment. A separate scenario is set for every partial shipment; 7.1P, 7.2P, 7.3P, 7.4P and 8P are created automatically with it. The scenario is done when all of them are closed.

Why this taskScenario of a partial shipment, a separate one for every partial shipment: done when 7.1P–7.4P and 8P are closed.BP map
What happens hereTogether with the scenario, 7.1P, 7.2P, 7.3P, 7.4P and 8P are created automatically.BP map
Who is responsible for whatSet by the KAM from a template under 7, for every shipment. Done by Aleksey Belyaev, co-assignee Sergei Baranov. Observers: finance. System: Bitrix (flow 250, project 14).BP map
7.1PAgreeing the shipmentcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with scenario 7F / 7P. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; co-assignee Sergei Baranov. Observer — you.

→
Result

Agreed date, time and address — in the task.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Agreeing the shipment with the client. The warehouse calls the client on the number from the shipment task, agrees the date and time of delivery, writes the agreement into the task chat and passes it on to the driver.

Why this taskTo agree the shipment date with the client.call 24.11, 02:14:53
What happens hereThe warehouse calls the client on the number from the shipment task, agrees the date and time of delivery, writes the agreement into the task chat and passes it on to the driver.instruction 7.1P
Who is responsible for whatCreated automatically together with scenario 7P, task creator Service User. Done by Aleksey Belyaev, co-assignee Sergei Baranov. System: Bitrix (project 14).BP map
7.2POtpremnica in 1С and deliverycreated automatically→Warehouselive
Setscreated automatically

Automatically — together with the scenario. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; delivery — Sergei Baranov, a courier or pickup by the client. Observers — finance and you.

→
Result

Scan of the signed otpremnica (delivery note) — as the result.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Otpremnica (delivery note) in 1С and delivery. The warehouse finds the client order in 1С, switches it to shipment, creates the sales document (realizacija) and prints the otpremnica in two copies, then hands the goods over for delivery. After delivery, a scan of the otpremnica signed by the client is attached to the task: that is the result.

Why this taskTo issue the otpremnica in 1С and deliver the goods; result of the task: a scan of the otpremnica signed by the client.instruction 7.2P
What happens hereThe warehouse finds the client order in 1С, switches it to shipment, creates the sales document (realizacija), prints the otpremnica in two copies, hands the goods over for delivery and after delivery attaches a scan of the signed otpremnica.instruction 7.2P
Who is responsible for whatCreated automatically together with the scenario, task creator Service User. Done by Aleksey Belyaev; delivery: Sergei Baranov, a courier or pickup by the client. Systems: 1С, Bitrix (project 14).BP map
7.3POtpremnica in MPPcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically — together with the scenario. Task creator — Service User. No need to set it by hand.

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova. Observers — Dmitrij Moiseev, Irina Leitskaya and you.

→
Result

MPP otpremnica (delivery note) number — as the result.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Otpremnica (delivery note) in MPP. Based on the signed otpremnica from 1С and the predračun (pro forma invoice), the administration creates the otpremnica in MPP: client, date, articles and quantity, price and VAT rate, delivery address. It must match the signed one; its number and PDF are given as the result of the task.

Why this taskSo that MPP has an otpremnica that matches the signed one in date, quantity and address; its number and PDF are given as the result of the task.instruction 7.3P
What happens hereBased on the signed otpremnica from 1С and the predračun, the administration creates the otpremnica in MPP: client, date, articles and quantity, price and VAT rate, delivery address. Then it saves the PDF and gives the result in the task.instruction 7.3P
Who is responsible for whatCreated automatically together with the scenario, task creator Service User. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. Systems: MPP, Bitrix (project 14).BP map
7.4PPosting costs in 1Сcreated automatically→Warehouselive
Setscreated automatically

Automatically — together with the scenario. Task creator — Service User. No need to set it by hand.

→
DoesWarehouse

Aleksey Belyaev; co-assignee Sergei Baranov. Observers — Dmitrij Moiseev, Irina Leitskaya, Polina Veliaeva and you.

→
Result

Delivery costs in 1С.

→
Where it is kept

outside a flow (sub-template) → project 14 «7. ОТГРУЗКА» (Shipment)

Delivery costs in 1С. The warehouse takes the delivery cost from the trip log, finds the client order in 1С, creates a cost document, posts it and writes about it in the task. This way the delivery costs are recorded in 1С against the client order.

Why this taskTo record the delivery costs in 1С against the client order.BP map
What happens hereThe warehouse takes the delivery cost from the trip log, finds the client order in 1С, creates a cost document by copying, posts it and writes about it in task 7.4.instruction 7.4P
Who is responsible for whatCreated automatically together with the scenario, task creator Service User. Done by Aleksey Belyaev, co-assignee Sergei Baranov. Systems: 1С, Bitrix (project 14).BP map
e-otp7.3 e-otpremnica (public sector)if neededSales · KAM→Financelive
SetsSales · KAM

B2G KAM, as a subtask of 01

→
DoesFinance

Dmitrij Moiseev; backup: co-assignees Mariya Zernyukova, Irina Leitskaya

→
Result

Electronic otpremnica (delivery note) sent; closed with a check by the task creator

→
Where it is kept

flow 190 → project 582 «7.3 e-otpremnica»

Electronic otpremnica (delivery note) for a government client. The B2G KAM sets the task as a subtask of 01 so that an electronic otpremnica is sent to the government client. How exactly this is done is not yet described by us.

Why this taskTo send an electronic otpremnica to the government client.BP map
What happens hereno data
Who is responsible for whatSet by the B2G KAM as a subtask of 01. Done by Dmitrij Moiseev; co-assignees Mariya Zernyukova and Irina Leitskaya. The task is closed with a check by the task creator. System: Bitrix (flow 190, project 582).BP map

Račun 2 tasks

8FRačun for the shipmentcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically — together with the scenario: with 7F comes 8F, with 7P comes 8P. Task creator — Service User. No need to set it by hand.

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova. Observers — Dmitrij Moiseev, Irina Leitskaya and you.

→
Result

Račun (invoice) in SEF, PDF in the task. Client not in SEF — the document is in the task, and you send it to the client.

→
Where it is kept

outside a flow (sub-template) → project 650 «8. B2B. Закрывающие документы (SEF или не SEF)» (Closing documents (SEF or not SEF))

Račun (invoice) for the shipped goods. Based on the predračun (pro forma invoice) and the signed otpremnica (delivery note), the administration creates the račun in MPP, makes it valid and sends it to SEF; the PDF marked «in sef» is put into the task. If the client is not in SEF, the KAM sends the document to them.

Why this taskTo issue the račun for the shipped goods to the client: račun in SEF, PDF in the task.BP map
What happens hereBased on the predračun and the signed otpremnica, the račun is created in MPP, the PDF is downloaded, the račun is made valid and sent to SEF; the PDF marked «in sef» is put into task 8F.instruction 8F
Who is responsible for whatCreated automatically together with scenario 7F, task creator Service User. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. If the client is not in SEF, the KAM sends the document to the client. Systems: SEF, Bitrix (project 650).BP map
8PDelimični računcreated automatically→Administration · MPPlive
Setscreated automatically

Automatically — together with the scenario: with 7F comes 8F, with 7P comes 8P. Task creator — Service User. No need to set it by hand.

→
DoesAdministration · MPP

Mariya Zernyukova; co-assignee Adelina Nasyrova. Observers — Dmitrij Moiseev, Irina Leitskaya and you.

→
Result

Račun (invoice) in SEF, PDF in the task. Client not in SEF — the document is in the task, and you send it to the client.

→
Where it is kept

outside a flow (sub-template) → project 650 «8. B2B. Закрывающие документы (SEF или не SEF)» (Closing documents (SEF or not SEF))

Delimični račun (partial invoice): a račun only for the shipped part of the order, with the advance offset. In MPP an obračun (settlement invoice) for what has been shipped is created from the predračun (pro forma invoice), checked against the otpremnica (delivery note), made valid and sent to SEF. The PDF is put into tasks 8P and 3.2, and the obračun is marked in the advance register.

Why this taskTo issue a račun only for the shipped part of the order, with the advance offset.instruction 8P
What happens hereIn MPP an obračun only for what has been shipped is created from the predračun, checked against the otpremnica, made valid and sent to SEF; the PDF is put into tasks 8P and 3.2, and the obračun is marked in the advance register.instruction 8P
Who is responsible for whatCreated automatically together with scenario 7P, task creator Service User. Done by Mariya Zernyukova, co-assignee Adelina Nasyrova. If the client is not in SEF, the KAM sends the document to the client. Systems: SEF, Bitrix (project 650).BP map

Closing 6 tasks

9Deal closing: SEF, money, costsSales · KAM→Sales · KAMlive
SetsSales · KAM

The KAM, from a template, under 01 — after the last račun (invoice) (8F or the last 8P).

→
DoesSales · KAM

The KAM — takes the task with the «Начать» (Start) button (flow 254, distribution «берёт сам» (takes it themselves): Anri Stepanian, Stanislav Efimov, Darya Zernykova, Danijel Ašanin, Mariia Lobachova). Observers — finance.

→
Result

Račun documents «Прихвачено» (Accepted) in SEF, payment posted in 1С and MPP, costs of the deal — in 1С.

→
Where it is kept

flow 254 (himself: a list of 4) → project 646 «9. Закрытие сделки» (Deal closing)

Deal closing, umbrella task. The KAM sets the task after the last račun (invoice), and 9.1, 9.2, 9.3 and 9.4 are created automatically with it. The deal is closed when the račun documents have been accepted in SEF, the payment has been posted in 1С and MPP, and the costs of the deal have been entered in 1С.

Why this taskTo close the deal: the račun documents accepted in SEF, the payment posted in 1С and MPP, the costs of the deal entered in 1С.BP map
What happens hereTogether with task 9, 9.1, 9.2, 9.3 and 9.4 are created automatically.BP map
Who is responsible for whatSet by the KAM from a template under 01 after the last račun; the KAM takes the task with the «Начать» (Start) button. Observers: finance. System: Bitrix (flow 254, project 646).BP map
9.1SEF and check of 7created automatically→Financelive
Setscreated automatically

Automatically — together with 9. Task creator — Service User. No need to set it by hand.

→
DoesFinance

Irina Leitskaya; backup Adelina Nasyrova (R6A). Observer — the KAM.

→
Result

Confirmation that the documents have been accepted and are correct.

→
Where it is kept

outside a flow (sub-template) → project 646 «9. Закрытие сделки» (Deal closing)

Check in SEF: the documents have been accepted and are correct. At the moment Irina checks the status in SEF. There is already a solution with a robot: it sees the status of the document and collects the data, and a person checks and confirms.

Why this taskTo get confirmation that the documents have been accepted and are correct.BP map
What happens hereAt the moment Irina checks the status in SEF. A solution with a robot already exists: through a connector it sees the status of the document and collects the data; a person checks and confirms.call 24.11, 02:20:37–02:21:27
Who is responsible for whatCreated automatically together with 9, task creator Service User. Done by Irina Leitskaya, backed up by Adelina Nasyrova; observer: the KAM. Systems: SEF, Bitrix (project 646).BP map
9.2Money receivedcreated automatically→Financelive
Setscreated automatically

Automatically — together with 9. Task creator — Service User. No need to set it by hand.

→
DoesFinance

Irina Leitskaya; backup Adelina Nasyrova (R6A). Observer — the KAM.

→
Result

Payment posted; task closed. Note: if the client does not pay, you remind the client.

→
Where it is kept

outside a flow (sub-template) → project 646 «9. Закрытие сделки» (Deal closing)

Money received. The task is closed only when the client has paid the order in full. Adelina and Mariya report incoming money every morning; even before the bank statement is posted in 1С, a robot writes to the groups and tasks that the payment for the invoice has arrived. If the client does not pay, the KAM reminds them.

Why this taskTo confirm that the client has paid the order in full: only then is the task closed.instruction 9.2
What happens hereAdelina and Mariya report incoming money every morning. Even before the bank statement is posted in 1С, a robot writes to the groups and tasks that the payment for the invoice has arrived and states how certain it is that this payment belongs to this particular deal.call 24.11, 02:21:45–02:22:40
Who is responsible for whatCreated automatically together with 9, task creator Service User. Done by Irina Leitskaya, backed up by Adelina Nasyrova; observer: the KAM. If the client does not pay, the KAM reminds them. Systems: 1С, Bitrix (project 646).BP map
9.3Costs postedcreated automatically→Financelive
Setscreated automatically

Automatically — together with 9. Task creator — Service User. No need to set it by hand.

→
DoesFinance

Dmitrij Moiseev; co-assignee Irina Leitskaya. Observers — Mariya Zernyukova, Adelina Nasyrova, Polina Veliaeva and you.

→
Result

Costs and cost price of the deal in 1С — for the final card.

→
Where it is kept

outside a flow (sub-template) → project 646 «9. Закрытие сделки» (Deal closing)

Costs posted. This is not a check but the closing of the deal in the accounts: everything has been shipped and posted, the cost prices calculated, the funds accounted for. After that the 1С data can be compared with the final deal card; the KPI is calculated from the gross profit of the deal.

Why this taskTo close the deal: everything shipped and posted, all cost prices calculated, all funds accounted for. The KPI is calculated from its gross profit.call 24.11, 02:23:05
What happens hereThis is not a check but the closing. When 9.3 is done and 9.4 is prepared, the 1С data can be compared with the KAM's final deal card.call 24.11, 02:23:05–02:23:35
Who is responsible for whatCreated automatically together with 9, task creator Service User. Done by Dmitrij Moiseev, co-assignee Irina Leitskaya. Systems: 1С, Bitrix (project 646).BP map
9.4Final deal card (plan / actual)created automatically→Sales · KAMlive
Setscreated automatically

Automatically — as a subtask of 9, together with 9.1–9.3 (this is how it is in the templates and in the test of 16.11; in live use the task creator is Service User). No need to set it separately.

→
DoesSales · KAM

The KAM: in the template the assignee is Vladimir Malykhin; reassign the task to yourself. Fill it in when 9.1–9.3 are closed.

→
Result

Link to the card — as the result of the task.

→
Where it is kept

outside a flow (sub-template) → project 646 «9. Закрытие сделки» (Deal closing)

Final deal card: plan and actual. The KAM opens the FinalDealCard tab in the deal table, enters the actual figures (sales, purchasing, customs, additional costs, payments) and gives the link as the result of the task. After approval by management, the KPI is calculated from the final card.

Why this taskTo compare plan and actual figures of the deal: after approval by management the KPI is calculated from the final card.call 24.11, 02:24:29–02:24:34
What happens hereThe KAM opens the FinalDealCard tab in the deal table, fills in the actual figures (sales, purchasing, customs, additional costs, payments) and gives the link as the result of the task.instruction 9.4
Who is responsible for whatCreated automatically as a subtask of 9. Assignee: the KAM; in the template Vladimir Malykhin is set, and the task has to be reassigned to yourself; fill it in when 9.1–9.3 are closed. System: Bitrix (project 646).BP map
9.4.1Approval of the final deal cardcreated automatically→Managementlive
Setscreated automatically

Automatically — together with 9.4. Task creator — Service User. No need to set it by hand.

→
DoesManagement

Kevin Müller; co-assignees Vladimir Malykhin and Daniil Petrzhikovskii. Observer — you.

→
Result

«Согласовано» (Approved) in the 9.4.1 chat.

→
Where it is kept

outside a flow (sub-template) → project 646 «9. Закрытие сделки» (Deal closing)

Approval of the final deal card. The task is created automatically together with 9.4: the approvers write «Согласовано» (Approved) in the task chat.

Why this taskTo approve the final deal card.BP map
What happens hereThe approvers write «Согласовано» in the 9.4.1 chat.BP map
Who is responsible for whatCreated automatically together with 9.4, task creator Service User. Approved by Kevin Müller; co-assignees Vladimir Malykhin and Daniil Petrzhikovskii. System: Bitrix (project 646).BP map

Returns 2 tasks

10CReturn from the clientSales · KAM→Warehousenot clarified yet
SetsSales · KAM

The KAM — a complaint or a refusal by the client.

→
DoesWarehouse

Warehouse — Aleksey Belyaev; administration — Mariya Zernyukova: documents in MPP and SEF; Procurement — contact with the supplier; Legal — in case of a dispute.

→
Result

Return otpremnica (return delivery note); Storno (cancellation), Knjižno odobrenje (credit note) or Povraćaj dobavljaču (return to supplier); corrections in 1С, MPP and SEF.

→
Where it is kept

flow 62 (shared «10*») → project 640 «10*. Возвраты (название группы не читалось)» (Returns (the group name could not be read))

Return from the client: in case of a complaint or a refusal. The procedure is not clarified yet. It is known which documents are involved: a return otpremnica (return delivery note); Storno (cancellation), Knjižno odobrenje (credit note) or Povraćaj dobavljaču (return to supplier); corrections in 1С, MPP and SEF.

Why this taskTo process a return from the client in case of a complaint or a refusal.BP map
What happens hereThe procedure is not clarified. The map names the documents: a return otpremnica; Storno, Knjižno odobrenje or Povraćaj dobavljaču; corrections in 1С, MPP and SEF.BP map
Who is responsible for whatSet by the KAM. Warehouse: Aleksey Belyaev; administration: Mariya Zernyukova, documents in MPP and SEF; Procurement: contact with the supplier; Legal: in case of a dispute. Systems: 1С, MPP, SEF, Bitrix (flow 62, project 640).BP map
10UReturn to the supplierProcurement→Warehousenot clarified yet
SetsProcurement

Procurement — a discrepancy at receipt, defective goods from the supplier.

→
DoesWarehouse

Warehouse — Aleksey Belyaev; administration — Mariya Zernyukova: documents in MPP and SEF; Procurement — contact with the supplier; Legal — in case of a dispute.

→
Result

Return otpremnica (return delivery note); Storno (cancellation), Knjižno odobrenje (credit note) or Povraćaj dobavljaču (return to supplier); corrections in 1С, MPP and SEF.

→
Where it is kept

flow 62 (shared «10*») → project 640 «10*. Возвраты (название группы не читалось)» (Returns (the group name could not be read))

Return to the supplier: in case of a discrepancy at receipt or defective goods. The procedure is not clarified yet. It is known which documents are involved: a return otpremnica (return delivery note); Storno (cancellation), Knjižno odobrenje (credit note) or Povraćaj dobavljaču (return to supplier); corrections in 1С, MPP and SEF.

Why this taskTo process a return to the supplier in case of a discrepancy at receipt or defective goods.BP map
What happens hereThe procedure is not clarified. The map names the documents: a return otpremnica; Storno, Knjižno odobrenje or Povraćaj dobavljaču; corrections in 1С, MPP and SEF.BP map
Who is responsible for whatSet by Procurement. Warehouse: Aleksey Belyaev; administration: Mariya Zernyukova, documents in MPP and SEF; Procurement: contact with the supplier; Legal: in case of a dispute. Systems: 1С, MPP, SEF, Bitrix (flow 62, project 640).BP map